C 170 wing repairs
Bird strike and a Ground loop repair
Cessna 170
Completed This 2-33 came in a while back, the fuselage had been covered, wings and control surfaces painted but the cockpit and controls had not been touched. With a new canopy frame, canopy, new rear door, rear window all new interior parts to fit it takes time. We disassembled all the controls cleaned the tubes,…
Hope this will be a winter project, lots of sheet metal.
Sold 6-1-21The first step has been to get to know the project airplane and after more than 30 hours of flying since I picked the airplane up in Mississippi I have got my to do list going. One thing you have to pay attention to before you buy is the condition of the aircraft and…
This plane has been in the shop for at least 4 years and has been a ground up restoration, nothing has not been touched and no expense spared. This is truly the owners pride and joy and we put our hearts into this for him. It has made us happy and to be appreciated for…
11-25-2024 We have been working on this project for 2 years and it is finally coming together, just maybe we can finish this up by spring……It will be one of the nicest 170’s ever that is for sure.
9-1-25 The good news is that 010 is coming together. The wings are on all flight controls are rigged, the flaps feel like brand new maybe that’s because they are. These wings have been rebuilt and all new flap tracks and rollers. the tail is on and rigged, Now we are just finishing up on…