170 horizontal rebuild
Rebuilding a 170 horizontal..
Rebuilding a 170 horizontal..
Ground loop, not a bad one but still took some time
Removing a camera hatch in my 1953 Cessna 180 and installing a baggage door.Specializing in minor and major sheet metal repairs to Cessna 180 and Cessna 185 aircraft. Repairing control surfaces to major gearbox repairs as well as STC modifications or service bulletins. This shows a little of the removal of a camera hatch in my Cessna…
There was a time I believe that the more engine rubber isolators the better but today everyone should have their engine balanced to their propeller. This is usually done by a propeller shop or a local with the proper equipment. When this is done the difference can be life changing, I also feel it makes…
When repairing a cowl I try to balance the repairs out and it is important to make the repairs look as if it is part of the original cowl or nice enough to make the cowl look better if not stronger and most important last. One thing is these cowl repairs are time consuming and…
Floor viewing window for swing loadsThis was a fun job, but like most metal working jobs it always takes longer than they say. It also takes a bit of thinking as you do the installation about how it fits, it maybe different than the drawing, or holes may not be able to go where they…