180 Horizontal skin replacement
Like many things when it gets old the dents start to show and the only option is a face lift. When this is done it is almost like new, your wife may not notice but you will.
Floor viewing window for swing loadsThis was a fun job, but like most metal working jobs it always takes longer than they say. It also takes a bit of thinking as you do the installation about how it fits, it maybe different than the drawing, or holes may not be able to go where they…
Removing a camera hatch in my 1953 Cessna 180 and installing a baggage door.Specializing in minor and major sheet metal repairs to Cessna 180 and Cessna 185 aircraft. Repairing control surfaces to major gearbox repairs as well as STC modifications or service bulletins. This shows a little of the removal of a camera hatch in my Cessna…
Just was out replacing a spar carry through on a Cessna 182, the problem was found during an annual inspection the culprit was an interior headliner that was glued to the spar carry through and moisture was caught between the fabric and the spar. This was the first annual for my customer on this plane,…
Repairing a Beaver horizontal stabilizer, opening up a can o worms
There was a time I believe that the more engine rubber isolators the better but today everyone should have their engine balanced to their propeller. This is usually done by a propeller shop or a local with the proper equipment. When this is done the difference can be life changing, I also feel it makes…
B19 same as B23Sheet metal work is as much an art as a skill. Most of the time there is very little to guide you other than a picture, some references in the maintenance manual or parts manual. And of corse the AC 43.13 to reference to. What also counts I’d how the repair or…