B19 same as B23Sheet metal work is as much an art as a skill. Most of the time there is very little to guide you other than a picture, some references in the maintenance manual or parts manual. And of corse the AC 43.13 to reference to. What also counts I’d how the repair or…
Fuselage repair
It all starts with rivets and time.
Tail problems
After removing the tail we found that an earlier replacement of the tail bulkheads with a later model 180 bulkhead, probably because of the plane going over on its back, was not done very well…….
Cessna 182E nose gear repair
Everything can be repaired but some things take longer than others. We took on this job with an idea of how much time but that usually changes as you disassemble. We were lucky that the nose gear survived and the firewall was still in good shape, it does have a few creases but still serviceable….
Old cowling
When repairing a cowl I try to balance the repairs out and it is important to make the repairs look as if it is part of the original cowl or nice enough to make the cowl look better if not stronger and most important last. One thing is these cowl repairs are time consuming and…
AD 2020-18-01 this is an inspection of the lower door post for cracks on 182
This is a 12000 hour Cessna 182, the cracks are found in the corner of the web, hard to see. Once the crack was found the aircraft was grounded, no ferry permit allowed. We spent three long days and travel to get the job done