Similar Posts
Helicopter
Floor viewing window for swing loadsThis was a fun job, but like most metal working jobs it always takes longer than they say. It also takes a bit of thinking as you do the installation about how it fits, it maybe different than the drawing, or holes may not be able to go where they…
Beech Sundowner baggage door
B19 same as B23Sheet metal work is as much an art as a skill. Most of the time there is very little to guide you other than a picture, some references in the maintenance manual or parts manual. And of corse the AC 43.13 to reference to. What also counts I’d how the repair or…
AD 2020-18-01 this is an inspection of the lower door post for cracks on 182
This is a 12000 hour Cessna 182, the cracks are found in the corner of the web, hard to see. Once the crack was found the aircraft was grounded, no ferry permit allowed. We spent three long days and travel to get the job done
Horizontal tip replacement
Replaced both left and right horizontal tips with Mc Farlane tips using 8 32 screws in place of rivets. The idea is that you can easily change out the tip if damaged, one thing is that if you operate a seaplane you need to put some corrosion protection on the nut plates and screws on…
170 horizontal rebuild
Rebuilding a 170 horizontal..










