Hanger fell in on this 180
Hope this will be a winter project, lots of sheet metal.
Completed This 2-33 came in a while back, the fuselage had been covered, wings and control surfaces painted but the cockpit and controls had not been touched. With a new canopy frame, canopy, new rear door, rear window all new interior parts to fit it takes time. We disassembled all the controls cleaned the tubes,…
9-1-25 The good news is that 010 is coming together. The wings are on all flight controls are rigged, the flaps feel like brand new maybe that’s because they are. These wings have been rebuilt and all new flap tracks and rollers. the tail is on and rigged, Now we are just finishing up on…
Bird strike and a Ground loop repair Cessna 170
Sold 6-1-21The first step has been to get to know the project airplane and after more than 30 hours of flying since I picked the airplane up in Mississippi I have got my to do list going. One thing you have to pay attention to before you buy is the condition of the aircraft and…
2022 comes the time to get this 180 going. It has been in the shop for over a week now and slowly ticking off the list of thing to do.
Our 180J project is coming to a close and is looking very good. This 180J is about as new as they come. Built in 1974 and then did not make it out of a lake in Alaska in 1981 from there it went from the back of a hanger and became a pet project of…