170 horizontal rebuild
Rebuilding a 170 horizontal..
Removing a camera hatch in my 1953 Cessna 180 and installing a baggage door.Specializing in minor and major sheet metal repairs to Cessna 180 and Cessna 185 aircraft. Repairing control surfaces to major gearbox repairs as well as STC modifications or service bulletins. This shows a little of the removal of a camera hatch in my Cessna…
Ground loop, not a bad one but still took some time
B19 same as B23Sheet metal work is as much an art as a skill. Most of the time there is very little to guide you other than a picture, some references in the maintenance manual or parts manual. And of corse the AC 43.13 to reference to. What also counts I’d how the repair or…
It all starts with rivets and time.
Had to go down to San Francisco to repair a Beaver, life is hard on a plane that has to sit day after day in the salt mash of the Bay. Thanks to my side kick and son we hammered it out and the customer was happy. Road repairs to plane and truck.